Press 16. Aug 17 to Aug 18. ERP scrap log.
How many lids the press made and scrapped each day
What it shows: The ERP shows press 16 on the same lid job each day, with how many lids it made and how many were scrap.
Why it proves the point: Both days stay under 1 percent, and neither jumps up the way a day with a job switch likely would.
From the plant's ERPERP scrap log
| Date | Lids molded | Lids scrapped | Share scrapped |
|---|---|---|---|
| Aug 17 | 12,900 | 100 | 0.8 percent |
| Aug 18 | 13,100 | 95 | 0.7 percent |
| Both days | 26,000 | 195 | 0.8 percent |