Illustrative sample. The plant, the weeks and the footage are synthetic.

Pythia Industries
Sample Plant
Back to Set up a mold-maintenance program

Aug 31 to Sep 4. ERP downtime log.

When the worst molds stopped presses, and why

What it shows: The ERP lists each stop the eight molds caused this week, with the time and the cause.

Why it proves the point: Two of the 4 stops came on Aug 31, before the check started, and only 2 in the four days it ran.

From the plant's ERPERP downtime log
DateTime the press stoppedCause logged
Aug 319:15 amFlash
Aug 317:40 pmDrag marks
Sep 22:05 pmFlash
Sep 411:30 pmDrag marks