Chute, belt and box counter
A chute and a belt carry the parts of two neighboring presses to one table, and a counter stops the belt at a full box.
| Cost | About $15,000 |
| Payback | About 3 months |
| Limitation | It works only where the hand work of two presses fits inside one cycle, and the two presses run the same hours. |
What changes
A chute under each press catches the parts, and a short belt carries them to one table between two presses.
One person at that table trims and packs for both presses, and a counter stops the belt at each full box.
First, a supervisor times the hand work at one press, to check that one person can keep up with two.
What it costs and could save
- For three presses the chutes, belts and counters cost about $15,000, and about $900 per year to keep up.
- After that upkeep they could save about $55,400 per year, a payback of about 3 months.
- The $55,400 is operator time, and it is cash only if overtime falls or a hire is not made.
Why it works
| Mechanism | - On a long job the hand work is the same every cycle, and the time left in the cycle is waiting.
- With the parts of two presses at one table, the wait at one press is filled with the hand work of the other.
- The counter does the counting, so the person does not have to watch a box fill.
|
| Math | - One person at each of three presses for about 2,500 hours per year is 7,500 operator hours.
- If one person tended two presses and nothing else got in the way, half of those hours would be freed.
- We count 25 percent, which is 1,875 hours, about $56,300 per year at $30 per hour.
- Upkeep of about $900 per year leaves about $55,400.
- The chutes, belts and counters cost about $15,000, a payback of about 3 months.
- Each press is worth about $18,500 per year, so the figure follows the count of presses.
|
| Industry evidence | - Makers of part conveyors sell belts with a counter that stops the belt at each full box.
- Mold design guides from resin suppliers describe a gate that cuts the part from its leftover plastic as the mold opens.
- In this plant, payroll lists about 15 operators and material handlers per shift for 26 presses.
- So on most presses one person already covers more than one.
- We found no published figure for the hours a shared table frees, so that share is our estimate.
|
| Limitations | - This is operator time, and it is cash only if overtime falls or a hire is not made.
- Payroll shows about 180 overtime hours per week, about 9,000 per year, and the 1,875 hours counted here are 21 percent of that.
- The shared table works only where the hand work of two presses fits inside one cycle, which the first check shows.
- It also needs two presses on long jobs side by side, running the same hours.
- One person then looks at the parts of two presses, so each part gets a shorter look.
|
Illustrative sample. The plant, the walk and the footage are synthetic.