Pythia Industries

Sample Plant

Press hours lost at each unplanned stop

Value1.2 hours per stop
Default1.2 hours per stop
Low0.8 hours per stop
High2 hours per stop
SourceOur estimate: the downtime log counts stops, not the time to the next good part
Notes
  • From the stop to the next good part: the wait for help, the cleaning or repair, and the restart.
  • Most stops are cleared at the press, and a few need the mold taken out, which takes far longer.
  • A stopwatch on the next ten stops replaces it.

Illustrative sample. The plant, the walk and the footage are synthetic.