Pythia Industries

Sample Plant

Evidence

Read together, they show molds here are cleaned after they fail, not at a set count of shots.

On the walk

Mold cleaned in a stopped press

17:35

We saw a mold being cleaned inside a stopped press. Its job waited while the press stood.

Checked by us on a still of the film

Repair log on the mold shop wall

22:10

The repair log on the wall lists most repairs after a mold had failed in a press.

Checked by us on a still of the film

Staff remark on mold repairs

22:34 to 22:43

Plant staff said a mold is fixed when it stops. Nobody named a plan for cleaning molds.

Said by plant staff on the walk

No counter on molds on the rack

24:40

We counted 14 molds on the rack. None showed a counter of the shots it has made.

Counted by us on stills of the film

Plant records

Repairs logged after a failure

Of 212 mold repairs in the log, 171 were made after the mold had failed in a press.

The mold shop repair log, twelve months

Stops on eight molds

Eight molds stop a press about nine times per week. A fix would start with them.

The ERP downtime log, twelve months

Illustrative sample. The plant, the walk and the footage are synthetic.